Hamilton, Victoria

The Hamilton mineral separation plant in Victoria accepts both Murray Basin and Jacinth-Ambrosia concentrate.
The plant has a feed rate of approximately 80 tonnes per hour with a processing capacity of approximately 700 thousand tonnes per annum of concentrate. Hamilton’s conversion potential is up to ~165 thousand tonnes of zircon and ~210 thousand tonnes of rutile per annum (depending on assemblage).

adminHamilton, Victoria